Monday, September 12, 2011

framing underway at bozier court

The structural steel frames have been erected and the S28 carpenters  John and Chris are erecting the timber frames. It won't be long until the basic skeleton is up and the buildings form  and massing can be better appreciated.
street view showing the portal frame and cantilevered hood

John & Chris erecting the frames

Its great to see the care taken by the subbies to protect the polished floor from any potential damage or staining.
Tomorrow we meet with JH Williams (Vantage windows) to run over the final details prior to window fabrication.