The existing dwelling |
There were some challenges in the design including
- providing the additional wind bracing required on the ground floor structure bearing in mind that there was little or no bracing in the original building.
- modifying the existing structure and footings to handle the additional loads imposed by the new upper levels
- trying to establish a method whereby the residents could live in the existing building during much of the construction process
![]() |
Image of the proposed alterations and additions |
Sanctuary 28 Projects successfully gained the construction contract and works are expected to commence before the end of February